Balanced draft furnace design depends on a specific and continuously maintained pressure relationship: the firebox held at a slight negative pressure relative to ambient, using induced and/or forced draft fans, so that flame and combustion gases are reliably directed out through the intended flue and stack path rather than into ductwork not designed to contain them.

The case below documents what happens when that balance is disturbed during a delayed plant startup: a backfire event in the primary reformer furnace, followed by implosion of the air duct.

Delayed Startup and Low Draft

The incident occurred during a startup that had already been delayed — a directly relevant detail, since startup conditions can deviate from an originally planned sequence in ways that affect draft management.

With draft conditions running low during the delayed startup, the pressure differential needed to keep combustion gases and flame flowing in the intended direction toward the stack was insufficient. The result was backfiring: flame and hot combustion gases propagating backward into the furnace’s air-duct system rather than exiting normally.

Air-Duct Implosion

The physical consequence was significant. The backfire event led to an implosion of the air duct — a sudden inward collapse consistent with the ductwork being subjected to a pressure or thermal condition it was not designed to withstand, arriving from a direction the original design did not anticipate.

This traces a direct line from a process-condition disturbance, insufficient draft, to physical failure of plant hardware, rather than remaining a purely operational near-miss.

Operational Lessons

The case is documented with named equipment, a timeline, and a root-cause investigation connecting the low-draft condition during the delayed startup to the backfire and subsequent implosion.

For plants operating balanced draft furnaces, it underscores a specific operational discipline. Startup delays are not simply a scheduling inconvenience: they can place draft management outside its normal operating envelope in ways that create a real mechanical failure pathway if not actively managed.

 

SOURCE & ATTRIBUTION

Source: S. Aleem, U. Asif, M. I. Idris, “Backfire in Balanced Draft Furnace,” Engro Fertilizers Limited, conference paper, pp. 215-222.

 

Develop Your Next Generation of Operators

 

For fertilizer producers, Fertilizer Academy offers complimentary Ammonia and Urea Onboarding Training for newly hired personnel and other professionals seeking a stronger foundation in ammonia and urea operations.

Explore the Ammonia Onboarding and Urea Onboarding training curriculum

Register your company using the Enterprise training request form or scan the QR code: